What type of controls will be in place to ensure continued safety of the project?

Pressure, temperature, and CO2 injection rate are continuously monitored at the well. Our project plans include automatic alarms and surface shut-off systems, as well as a monitoring well to ensure the formation is securely holding the sequestered CO2. In addition to the continuous measurement and monitoring, fluid sampling and mechanical integrity testing are performed regularly on the project wells. In the long term, there are periodic 3D seismic studies to monitor the underground location of the CO2.